Preparation of design solutions for the reconstruction of the highway Kaunas-Marijampolė-Suvalkai (A5) stretch from 57.7 km to 97.06 km
Year 2014
Kelprojektas carries out the preparation works of design solutions for the reconstruction of the highway Kaunas-Marijampolė-Suvalkai (A5) stretch from 57.7 km to 97.06 km.
Undergoing works:
- Engineering geologic, geodetic, economic, and other surveys
- Field research of vehicle intensity and flow constitution
- Field research of traffic of pedestrians and other road users
- Analysis of the benefit of statistical reconstruction project costs
- Ecological survey (noise simulation, biological diversity, identification of significance of the impact of planned economic activities on the existing or potential Natura 2000 territories)
- Preparation of design solutions for the structure construction.
With a view to discover the most optimal solutions for the reconstruction of the road stretch of A5 highway, the specialists of Kelprojektas will work out at least 3 different design solution options. The first option will offer the reconstruction of the existing road stretch without making any changes in the route; other design solution options will offer the new locations for the construction of the road.