Adjustment of technical design of wastewater treatment systems
Year 2021
Adjustment of the technical project “Development of Wastewater Treatment Systems in Tauragė District, Mažonų Settlement”.
A correction will be prepared, which will include domestic wastewater networks and treatment facilities in Mažonai settlement in Tauragė district.
The tracing of the designed domestic sewage networks with branches will be adjusted by connecting the local sewage networks with self-flow.
Sewage treatment plants will be replaced by designing them in plastic tanks instead of those designed in reinforced concrete tanks.
The electrical part will also be adjusted in accordance with the new AB ESO connection conditions.