Technical project for rail transport, in the territory of the free economic zone of Akmenė, for the newly built wood chipboard factory
Year 2019
The project designed the connection of the access railway to the section of infrastructure Alkiškiai-Karpėnai managed by AB Lietuvos Geležinkeliai, and the development of access and loading railways in the FEZ factory area. Total length of the designed railway tracks is 3.05 km.